Projects

Six High-Impact Investments Across Three Continents

Each project reflects Delta's frontier exploration philosophy, integrated value chain approach, and sovereign partnership model — one of the most geographically and technically diversified portfolios held by any privately held Arab energy investor.

ProjectGeographyCommodityStageDelta Role
Integrated Gas Program (SECA)AfghanistanNatural GasDevelopmentLead Investor & Program Sponsor
CENTGAZ — Corridor of ProsperityAfghanistanGas TransitInfrastructureLead Developer
Barrancas Area Integrated Gas ProjectVenezuelaGas + Crude + LNGExploration & DevelopmentCo-Investor & Operator
Uganda 5BB ProjectUgandaCrude OilExplorationStrategic Partner
Illizi South E&D (Midad Energy)AlgeriaGas, LPG & CondensatesExploration & DevelopmentDelta Affiliate
Yanbu Delta ComplexSaudi ArabiaCrude · LNG · RefinedVision / Future DevelopmentLead Developer & Owner
Project · CENTGAZ

CENTGAZ: The Corridor of Prosperity

Afghanistan Gas Pipeline Network — Integrated Export Corridor

The CENTGAZ Project is a strategic cross-border gas transmission infrastructure project — establishing a direct gas transit corridor from Iran and Central Asian supply sources through Afghanistan to the Pakistani border, positioning Afghanistan as an indispensable energy transit state.

Herat
Northern entry hub
Helmand
Mid-route node
Kandahar
Southern hub
Spin Boldak
AF–PK cross-border
  • 01Direct supply corridor to Pakistan's gas-deficit market
  • 02Physical backbone for Afghanistan's national gas pipeline network
  • 03Enables LNG conversion and export via Gwadar terminal
  • 04Generates long-term transit revenue for the Afghan government
Project · SECA Afghanistan

Afghanistan Integrated Gas Development Program

Amu Darya Basin — 30-Year Strategic Energy Cooperation Agreement. A multi-billion-dollar integrated program spanning upstream, midstream, and downstream — designed to transform Afghanistan into a Regional Gas Hub for Central Asia.

Upstream
USD ~3 Bn
20 years

Amu Darya, Herat, Afghan-Tajik, Katawaz Basins. Resource base ~16 TCF natural gas across four major basins.

Midstream
USD 13–18 Bn
Total CAPEX

3 major export corridors + 4 domestic corridors + Gwadar LNG Terminal + Compression & Storage.

Downstream
900 MW
3 × 300 MW CCGT

Phased gas power cluster — Years 1–5. Projected Equity IRR 25–30% per phase.

16 TCF
Natural Gas
1.6 Bn bbl
Crude Oil
500 MMbbl
Natural Gas Liquids
USD 1.5–2.5/MMBtu
Pipeline Transit Tariff
Project · Venezuela

Barrancas Area Integrated Gas Project

Barinas-Apure Basin, Venezuela — 35-year PDVSA Gas License. Built around 2.3 TCF of recoverable gas across three confirmed prospects, with four compounding revenue layers and projected IRR of 74.6%.

Layer 04
LNG Export
USD 122M
Layer 03
Topping Refinery (50,000 BPD)
USD 2,380M
Layer 02
Termobarrancas Power (450 MW)
USD 827M
Layer 01
2.3 TCF Recoverable Gas
USD 428M
4-Year Gross Total
USD 3,474 M
Annual Revenue by Stream (USD M)
  • Crude Oil Sales
  • Direct Gas Sales
  • Refinery + LNG
  • Termobarrancas Power
Year 1Year 2Year 3Year 40500100015002000
74.6%
Project IRR
7.4x
Equity Multiple
~25 mo
Payback
USD 351M
4-Year Net Cash
Project · Uganda 5BB

Uganda 5BB Project

Southern Albertine Graben — East Africa Basin

Uganda's Albertine Graben has yielded 6.5 billion barrels of discovered oil, attracted USD 15 billion in infrastructure investment from TotalEnergies and CNOOC, and achieved an 88% all-in drilling success rate. Delta holds two exploration licenses: Kanywataba (KCA) and Turaco (TCA).

Discovered
6.5 Bn bbl
Success Rate
58%
All-in Drilling
88%
EACOP Export
216–246k BPD
  • 01Kanywataba (KCA): P10 1,652 MMBBL · Drill-ready 2-well program
  • 02Turaco (TCA): P10 1,502 MMBBL · 5 prospects and leads
  • 03Total unrisked recoverable: 1,000 MMBBL (P10)
  • 04Projected IRR at $80/bbl: 24–30%
Project · Illizi South

Illizi South Exploration & Development

Algeria · Midad Energy / Sonatrach

On October 13, 2025, Midad Energy North Africa — an affiliate of Delta International — signed a landmark 30-year PSA with Sonatrach for the Illizi South contractual area, ~100 km south of In Amenas in the Illizi Basin. The signing ceremony was attended by the Algerian Minister of Hydrocarbons and the Saudi Ambassador to Algeria.

BlockIllizi South — ~100 km south of In Amenas
Contract TypePSA — Algerian Law No. 19-13
Duration30 years + 10-year extension
Total Investment~USD 5.4 Billion (100% Midad)
Exploration BudgetUSD 288 Million
Expected Production993 MMboe over life
Gas Production125 BCM natural gas
Liquids204 MMbbl (103 LPG + 101 condensates)
Project · Yanbu Delta Complex

Yanbu Delta Complex

Red Sea · Saudi Arabia

A landmark vision project of Delta International Energy — a large-scale, fully integrated downstream and midstream energy complex planned for development on the Red Sea coast of the Kingdom at the strategic industrial hub of Yanbu. Aligned with Vision 2030.

Zone 1 · Refinery
50 MTPA

Processing Gulf crude into refined petroleum products for domestic Saudi demand and Red Sea export markets.

Zone 2 · LNG Terminal
60 MTPA

Combined LNG import and export infrastructure enabling Saudi Arabia to participate in global LNG trade via the Red Sea corridor.

Zone 3 · Crude Storage
10 MMbbl

Strategic crude storage for supply chain security and trading flexibility.